Guangxi 1200 tons per hour lead-zinc ore crushing
Project Profile
This is a 1200tph of lead-zinc ore ore crushing production line for a mining company in Guangxi, after many visits and comparison of a number of manufacturers, finally the client chose our reasonable and mature planning, the use of stable and efficient equipment, the consideration of the subsequent transport distance of the mine blasting material, the use of two sets of feed coarse crushing system and installed, coarse crushing capacity of more than 1,400 tons per hour, the transfer of the use of large-scale basement to Considering the buffer, to meet the subsequent continuous production of fine crushing production line. The medium and fine crushing equipment adopts our fist product: hydraulic cone crusher, the equipment is mature, efficient and stable with a high degree of automation.
-
Raw material for processing:
lead-zinc ore mine -
Feed size:
-
Discharge particle size:
-
Designed output:
0-25mm -
Processing:
-
Finished product use:
-
Main
F5X1660 Feeder /2 sets, C5X1450×1100 Jaw crusher/2sets, HST500(S) Single-cylinder hydraulic Cone crusher/1 set,HPT500M hydraulic cone crusher/3sets, S5X3075-3T heavy-duty Vibrating Screen/5 sets.
equipment:
Related equipment
Project Advantages
Screening:Heavy Duty Vibrating Screen Five S5X3075-3T.
The production line adopts:a coarse crushing + two "crushing + screening" closed-circuit system, three HPT500 multi-cylinder hydraulic cone crusher fine crushing effect is better, corresponding to three vibrating screen, screening capacity to improve the screening clean effect is better, the overall equipment utilization rate is high, the capacity is stable. Multi-cylinder hydraulic cone crusher has a high one-time yield, reduces the return material to be crushed repeatedly, reduces the abrasion of cone crusher, and also reduces the wear and tear of vibrating screen, and at the same time, ensures the stability of production capacity. Vibrating screen adopts S5X3075-3T heavy-duty Vibrating screen One model, reduce equipment models, unified spare parts equipment types, wear parts utilization rate increased, but also can reduce production costs.
Conclusion
The overall stability and reliability of the production line, the design is scientific and reasonable, to achieve the high standard requirements of the demonstrative "green intelligent mine", for the customer to establish the sex in order to not fall behind in the twenty years of production projects, has been the customer company up and down the staff's unanimous praise.